The Renovation Wave for Europe highlighted the role of the public building stock for which Directive 2012/27/EU has set an annual renewal rate of 3%, which should rise to reach the goal of decarbonization by 2050. In this paper, the energy retrofit of an educational building—at the academic level—in Southern Italy was investigated. The aim was to evaluate the incentive share, which could accelerate the energy efficiency process, to achieve a cost-effective nZEB. The results show that the highest incentive rate is required for interventions on the opaque building envelope, which are also those that allow the least energy savings. An incentive rate of about 45% for the energy efficiency of the transparent envelope is necessary to reduce the payback time by about 7 years. The efficiency of the plants and the installation of a PV system are energetically and economically convenient even without forms of economic incentive. Finally, if the building is brought to high energy standards—a primary energy saving of 46% and energy class A3—an incentive rate of 40% is required to repay the intervention in about 10 years.

Assessment of the Incentive Rate to Favor the Energy Retrofit of Public Buildings: A Comprehensive Approach for an Italian University Facility / Aruta, G.; Ascione, F.; Bianco, N.; Iovane, T.; Mastellone, M.. - In: ENERGIES. - ISSN 1996-1073. - 16:11(2023), p. 4483. [10.3390/en16114483]

Assessment of the Incentive Rate to Favor the Energy Retrofit of Public Buildings: A Comprehensive Approach for an Italian University Facility

Aruta G.;Ascione F.
;
Bianco N.;Iovane T.;Mastellone M.
2023

Abstract

The Renovation Wave for Europe highlighted the role of the public building stock for which Directive 2012/27/EU has set an annual renewal rate of 3%, which should rise to reach the goal of decarbonization by 2050. In this paper, the energy retrofit of an educational building—at the academic level—in Southern Italy was investigated. The aim was to evaluate the incentive share, which could accelerate the energy efficiency process, to achieve a cost-effective nZEB. The results show that the highest incentive rate is required for interventions on the opaque building envelope, which are also those that allow the least energy savings. An incentive rate of about 45% for the energy efficiency of the transparent envelope is necessary to reduce the payback time by about 7 years. The efficiency of the plants and the installation of a PV system are energetically and economically convenient even without forms of economic incentive. Finally, if the building is brought to high energy standards—a primary energy saving of 46% and energy class A3—an incentive rate of 40% is required to repay the intervention in about 10 years.
2023
Assessment of the Incentive Rate to Favor the Energy Retrofit of Public Buildings: A Comprehensive Approach for an Italian University Facility / Aruta, G.; Ascione, F.; Bianco, N.; Iovane, T.; Mastellone, M.. - In: ENERGIES. - ISSN 1996-1073. - 16:11(2023), p. 4483. [10.3390/en16114483]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/931404
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 1
social impact