The problem of managing existing structures before and after seismic events has led to the development of many di erent strategies across the lobe. These aim to mitigate the catastrophic e ects of earthquakes on the occupants of a building, as well as improve the management of the emergency that inevitably ensues. This paper explores the use of an openBIM approach to resolve the issues referred to above, which is possible because of two new standards: Industry Foundation Classes and Information Delivery Manuals. A review of the most popular strategies adopted in both the pre- and post-earthquake phases is conducted using a process map. This organizes the relevant steps and processes into tasks, and additionally identifies the points at which information is produced and exchanged and the party responsible for doing so. Also described is how BIM models can be utilized in essential pre- and post-earthquake activities, as well as current benefits and ongoing developments intended to improve the processes themselves.

Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases / Musella, Christian; Serra, Milena; Salzano, Antonio; Menna, Costantino; Asprone, Domenico. - In: CIVILENG. - ISSN 2673-4109. - 1:3(2020), pp. 291-309. [10.3390/civileng1030019]

Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases

Christian Musella;Milena Serra;Antonio Salzano;Costantino Menna;Domenico Asprone
2020

Abstract

The problem of managing existing structures before and after seismic events has led to the development of many di erent strategies across the lobe. These aim to mitigate the catastrophic e ects of earthquakes on the occupants of a building, as well as improve the management of the emergency that inevitably ensues. This paper explores the use of an openBIM approach to resolve the issues referred to above, which is possible because of two new standards: Industry Foundation Classes and Information Delivery Manuals. A review of the most popular strategies adopted in both the pre- and post-earthquake phases is conducted using a process map. This organizes the relevant steps and processes into tasks, and additionally identifies the points at which information is produced and exchanged and the party responsible for doing so. Also described is how BIM models can be utilized in essential pre- and post-earthquake activities, as well as current benefits and ongoing developments intended to improve the processes themselves.
2020
Open BIM Standards: A Review of the Processes for Managing Existing Structures in the Pre- and Post-Earthquake Phases / Musella, Christian; Serra, Milena; Salzano, Antonio; Menna, Costantino; Asprone, Domenico. - In: CIVILENG. - ISSN 2673-4109. - 1:3(2020), pp. 291-309. [10.3390/civileng1030019]
File in questo prodotto:
File Dimensione Formato  
3 - civileng-01-00019.pdf

accesso aperto

Descrizione: Paper
Tipologia: Versione Editoriale (PDF)
Licenza: Non specificato
Dimensione 6.96 MB
Formato Adobe PDF
6.96 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/892321
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? ND
social impact