The present work is part of a line of research that wants to define procedures for the digitization and management of the existing building her- itage; such procedures must be valid for both modern and historical construc- tions. This article aims to present the preliminary results of the studies conducted on an existing historical-cultural building, of which the digital model must be reconstructed. In detail, after a brief analysis of the complex, we focused on the acquiring and processing procedures of the necessary data for the reconstruction of the BIM model. The survey phase involved two different moments: the first one was characterized by the exploratory activities required for the second one, in which Lidar and UAV systems were used to fully define the geometry of a part of the complex. The study shows also some problems encountered during data processing and the related solutions found: these data, indeed, had to be manageable and functional for the reconstruction of a BIM model, which could be included in a tender notice.

The BIM Model for Existing Building Heritage: From the Geometric Data Acquisition to the Information Management / Giannattasio, Carllo; Papa, LIA MARIA; D'Agostino, Pierpaolo; D'Auria, Saverio. - Volume 1 - History and Heritage:(2020), pp. 311-322. [10.1007/978-3-030-47979-4]

The BIM Model for Existing Building Heritage: From the Geometric Data Acquisition to the Information Management

Lia Maria Papa
;
Pierpaolo D'Agostino
;
Saverio D'Auria
2020

Abstract

The present work is part of a line of research that wants to define procedures for the digitization and management of the existing building her- itage; such procedures must be valid for both modern and historical construc- tions. This article aims to present the preliminary results of the studies conducted on an existing historical-cultural building, of which the digital model must be reconstructed. In detail, after a brief analysis of the complex, we focused on the acquiring and processing procedures of the necessary data for the reconstruction of the BIM model. The survey phase involved two different moments: the first one was characterized by the exploratory activities required for the second one, in which Lidar and UAV systems were used to fully define the geometry of a part of the complex. The study shows also some problems encountered during data processing and the related solutions found: these data, indeed, had to be manageable and functional for the reconstruction of a BIM model, which could be included in a tender notice.
2020
978-3-030-47978-7
The BIM Model for Existing Building Heritage: From the Geometric Data Acquisition to the Information Management / Giannattasio, Carllo; Papa, LIA MARIA; D'Agostino, Pierpaolo; D'Auria, Saverio. - Volume 1 - History and Heritage:(2020), pp. 311-322. [10.1007/978-3-030-47979-4]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/812246
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact