The present paper proposes a modified version of the Manufacturing cost deployment (MCD) method to analyse engineer-to-order (ETO) production systems. The novel approach, named Project cost deployment (PCD), introduces two substantial and innovative modifications. To begin with, the concept of manual assembly macro-activity replaces the traditional concept of station. Then, a brand-new structure for classifying and analysing losses is introduced, that is specifically defined to deal with the inefficiencies of the manual assembly tasks. The validity of the approach is proved by a real-world industrial application. The obtained results demonstrate that the PCD method allows the analyst to identify the hidden losses and to quantify the wastes from an economical point of view. In addition, PCD permits to estimate the impacts of potential (lean) improvement activities and projects in terms of both efficiency and effectiveness.

Lean manufacturing tool in engineer-to-order environment: Project cost deployment / Braglia, Marcello; Frosolini, Marco; Gallo, Mosè; Marrazzini, Leonardo. - In: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. - ISSN 0020-7543. - 57:6(2019), pp. 1825-1839. [10.1080/00207543.2018.1508905]

Lean manufacturing tool in engineer-to-order environment: Project cost deployment

Gallo, Mosè;
2019

Abstract

The present paper proposes a modified version of the Manufacturing cost deployment (MCD) method to analyse engineer-to-order (ETO) production systems. The novel approach, named Project cost deployment (PCD), introduces two substantial and innovative modifications. To begin with, the concept of manual assembly macro-activity replaces the traditional concept of station. Then, a brand-new structure for classifying and analysing losses is introduced, that is specifically defined to deal with the inefficiencies of the manual assembly tasks. The validity of the approach is proved by a real-world industrial application. The obtained results demonstrate that the PCD method allows the analyst to identify the hidden losses and to quantify the wastes from an economical point of view. In addition, PCD permits to estimate the impacts of potential (lean) improvement activities and projects in terms of both efficiency and effectiveness.
2019
Lean manufacturing tool in engineer-to-order environment: Project cost deployment / Braglia, Marcello; Frosolini, Marco; Gallo, Mosè; Marrazzini, Leonardo. - In: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. - ISSN 0020-7543. - 57:6(2019), pp. 1825-1839. [10.1080/00207543.2018.1508905]
File in questo prodotto:
File Dimensione Formato  
Lean manufacturing tool in engineer to order environment Project cost deployment.pdf

non disponibili

Tipologia: Documento in Post-print
Licenza: Accesso privato/ristretto
Dimensione 2.04 MB
Formato Adobe PDF
2.04 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/749907
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 36
  • ???jsp.display-item.citation.isi??? 29
social impact