Optimal scheduling of shopfloor activities in an environment of discrete part manufacturing is discussed. The scheduling problem is a well known NP complete one. The main part, the sequencing problem, has been tackled using two techniques: Virtual resources identification and taboo search heuristics. The first approach allowed the authors to reduce the complexity of the sequencing from a job shop to a general flow shop problem. On the other hand, the search for an optimal solution, with respect to a fixed strategy, has been achieved via the taboo search. A synthesis of the results of a large number of tests is presented as well as the results of an application to a real case. The latter is shown in comparison with the output of the system being presently used in the examined factory. © 1993 Taylor & Francis Group, LLC.

A new prototype system for optimized job shop scheduling / Lambiase, A; Paesano, G; Santillo, LIBERATINA CARMELA. - In: PRODUCTION PLANNING & CONTROL. - ISSN 0953-7287. - 4:4(1993), pp. 385-391. [10.1080/09537289308919460]

A new prototype system for optimized job shop scheduling

Santillo
1993

Abstract

Optimal scheduling of shopfloor activities in an environment of discrete part manufacturing is discussed. The scheduling problem is a well known NP complete one. The main part, the sequencing problem, has been tackled using two techniques: Virtual resources identification and taboo search heuristics. The first approach allowed the authors to reduce the complexity of the sequencing from a job shop to a general flow shop problem. On the other hand, the search for an optimal solution, with respect to a fixed strategy, has been achieved via the taboo search. A synthesis of the results of a large number of tests is presented as well as the results of an application to a real case. The latter is shown in comparison with the output of the system being presently used in the examined factory. © 1993 Taylor & Francis Group, LLC.
1993
A new prototype system for optimized job shop scheduling / Lambiase, A; Paesano, G; Santillo, LIBERATINA CARMELA. - In: PRODUCTION PLANNING & CONTROL. - ISSN 0953-7287. - 4:4(1993), pp. 385-391. [10.1080/09537289308919460]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/899437
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact