An approach to design a prognostic based maintenance strategy for railway power converter unit / Fusco, Lucio; Pagano, Mario. - 2015-:(2015), pp. 1-6. (Intervento presentato al convegno International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles, ESARS 2015 tenutosi a deu nel 2015) [10.1109/ESARS.2015.7101501].

An approach to design a prognostic based maintenance strategy for railway power converter unit

FUSCO, LUCIO;PAGANO, MARIO
2015

2015
9781479974009
An approach to design a prognostic based maintenance strategy for railway power converter unit / Fusco, Lucio; Pagano, Mario. - 2015-:(2015), pp. 1-6. (Intervento presentato al convegno International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles, ESARS 2015 tenutosi a deu nel 2015) [10.1109/ESARS.2015.7101501].
File in questo prodotto:
File Dimensione Formato  
esars2015_Pagano.pdf

solo utenti autorizzati

Tipologia: Documento in Pre-print
Licenza: Accesso privato/ristretto
Dimensione 191.59 kB
Formato Adobe PDF
191.59 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/687230
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 0
social impact