Since 1839, when the historical railway Naples - Portici was inaugurated, Naples has been characterized by a significant system of urban and suburban railways. The idea of a fully integrated urban rail network dates back to the 1950s, but construction only began in the 1990s. At present, the system includes 54 km of tracks and 69 stations in operation; ten lines with 93 km of track and a further 30 km of new light rail linking 114 stations with 21 interchanges are planned with the completion of the City Transport Plan. The present paper reports on some geotechnical aspects of the design and construction of Lines 1 and 6, which are presently underway, discussing how the experience gathered during construction of Line 1 influenced some of the design choices for Line 6.

Geotechnical design and construction issues for Lines 1 and 6 of the Naples Underground / Russo, Gianpiero; Viggiani, G; Viggiani, Gmb. - In: GEOMECHANIK UND TUNNELBAU. - ISSN 1865-7362. - 3:5(2012), pp. 300-311. [10.1002/geot.201200016]

Geotechnical design and construction issues for Lines 1 and 6 of the Naples Underground

RUSSO, GIANPIERO;
2012

Abstract

Since 1839, when the historical railway Naples - Portici was inaugurated, Naples has been characterized by a significant system of urban and suburban railways. The idea of a fully integrated urban rail network dates back to the 1950s, but construction only began in the 1990s. At present, the system includes 54 km of tracks and 69 stations in operation; ten lines with 93 km of track and a further 30 km of new light rail linking 114 stations with 21 interchanges are planned with the completion of the City Transport Plan. The present paper reports on some geotechnical aspects of the design and construction of Lines 1 and 6, which are presently underway, discussing how the experience gathered during construction of Line 1 influenced some of the design choices for Line 6.
2012
Geotechnical design and construction issues for Lines 1 and 6 of the Naples Underground / Russo, Gianpiero; Viggiani, G; Viggiani, Gmb. - In: GEOMECHANIK UND TUNNELBAU. - ISSN 1865-7362. - 3:5(2012), pp. 300-311. [10.1002/geot.201200016]
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/485295
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 42
  • ???jsp.display-item.citation.isi??? ND
social impact