The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.

The Economic Feasibility of Four-Phase AC Overhead Connections / Lauria, Davide; G., Mazzanti; S., Quaia. - (2011), pp. 541-546. (Intervento presentato al convegno Clean Electrical Power (ICCEP), 2011 International Conference tenutosi a Ischia - Italy nel 14-16 June 2011) [10.1109/ICCEP.2011.6036287].

The Economic Feasibility of Four-Phase AC Overhead Connections

LAURIA, DAVIDE;
2011

Abstract

The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.
2011
9781424489282
9781424489299
The Economic Feasibility of Four-Phase AC Overhead Connections / Lauria, Davide; G., Mazzanti; S., Quaia. - (2011), pp. 541-546. (Intervento presentato al convegno Clean Electrical Power (ICCEP), 2011 International Conference tenutosi a Ischia - Italy nel 14-16 June 2011) [10.1109/ICCEP.2011.6036287].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/451547
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? ND
social impact