The status of the activities towards the realization of a km^3 Cherenkov neutrino detector carried out by the NEMO Collaboration is described. The realization of a Phase-1 project, which is under way, will validate the proposed technologies for the realization of the km^3 detector on a Test Site at 2000 m depth. The realization of a new infrastructure on the candidate site (Phase-2 project) will provide the possibility to test detector components at 3500 m depth.
Recent achievements of the NEMO project / E., M., S., A., Aloisio, A., F., A., I., A., Barbarino, G., DE ROSA, G.. - In: NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. - ISSN 0168-9002. - STAMPA. - 588:(2008), pp. 111-118. [10.1016/j.nima.2008.01.012]
Recent achievements of the NEMO project
ALOISIO, ALBERTO;BARBARINO, GIANCARLO;DE ROSA, GIANFRANCA
2008
Abstract
The status of the activities towards the realization of a km^3 Cherenkov neutrino detector carried out by the NEMO Collaboration is described. The realization of a Phase-1 project, which is under way, will validate the proposed technologies for the realization of the km^3 detector on a Test Site at 2000 m depth. The realization of a new infrastructure on the candidate site (Phase-2 project) will provide the possibility to test detector components at 3500 m depth.| File | Dimensione | Formato | |
|---|---|---|---|
|
Recent achievements.pdf
non disponibili
Tipologia:
Documento in Post-print
Licenza:
Accesso privato/ristretto
Dimensione
1.26 MB
Formato
Adobe PDF
|
1.26 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


