In September 2001, following an exceptional rainfall event with an estimated return time of about 500 years, a number of ancient buildings located in a restricted area in the historical centre of Napoli underwent significant settlement and heavy structural damage. Structural collapse on saturation of the pyroclastic soils and loss of bearing capacity by submersion are believed to be the origin of the observed phenomena. After the settlements came to a standstill, a subsoil investigation was carried out and a remedial solution was designed, based on a massive underpinning of the damaged buildings by micropiles. The size of the project and the well known dependence of the behaviour of micropiles on technological details suggested some preliminary load tests on piles to be undertaken. The results of two load tests on instrumented piles installed with different procedures are reported and discussed. A new technique to install embedment vibrating wire gauges was experimented and was revealed to be successful. The experimental findings are in good agreement with Bustamante & Doix (1985) method. Also the simplified approach proposed by Randolph & Wroth (1978) to evaluate the siffness of the soil layer was checked, providing good results. The experimental finding about the mobilisation of some negative skin friction along the pile shaft probably due to the large grouted volumes is confirmed by several finite element analyses.

Full scale load tests on instrumented micropiles / Russo, Gianpiero. - In: PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS. GEOTECHNICAL ENGINEERING. - ISSN 1353-2618. - STAMPA. - 157:(2004), pp. 127-135.

Full scale load tests on instrumented micropiles

RUSSO, GIANPIERO
2004

Abstract

In September 2001, following an exceptional rainfall event with an estimated return time of about 500 years, a number of ancient buildings located in a restricted area in the historical centre of Napoli underwent significant settlement and heavy structural damage. Structural collapse on saturation of the pyroclastic soils and loss of bearing capacity by submersion are believed to be the origin of the observed phenomena. After the settlements came to a standstill, a subsoil investigation was carried out and a remedial solution was designed, based on a massive underpinning of the damaged buildings by micropiles. The size of the project and the well known dependence of the behaviour of micropiles on technological details suggested some preliminary load tests on piles to be undertaken. The results of two load tests on instrumented piles installed with different procedures are reported and discussed. A new technique to install embedment vibrating wire gauges was experimented and was revealed to be successful. The experimental findings are in good agreement with Bustamante & Doix (1985) method. Also the simplified approach proposed by Randolph & Wroth (1978) to evaluate the siffness of the soil layer was checked, providing good results. The experimental finding about the mobilisation of some negative skin friction along the pile shaft probably due to the large grouted volumes is confirmed by several finite element analyses.
2004
Full scale load tests on instrumented micropiles / Russo, Gianpiero. - In: PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS. GEOTECHNICAL ENGINEERING. - ISSN 1353-2618. - STAMPA. - 157:(2004), pp. 127-135.
File in questo prodotto:
File Dimensione Formato  
Fullscaleloadtestsonmicropiles.pdf

solo utenti autorizzati

Descrizione: ARTICOLO PRINCIPALE
Tipologia: Documento in Post-print
Licenza: Accesso privato/ristretto
Dimensione 5.49 MB
Formato Adobe PDF
5.49 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11588/110303
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 32
  • ???jsp.display-item.citation.isi??? 26
social impact