Sfoglia per Autore
Master production schedule generation in a multi-item single-machine capacited manufacturing system with sequence-dependent setup times and costs
2005 F., Frattini; Nenni, MARIA ELENA; Rossi, Angelo; M., Schiraldi
Determining safety stock with backlogging and delivery spare time
2005 Nenni, MARIA ELENA; M., Schiraldi; S., VAN DE VELDE
Development of an intelligent tool fro the remote maintenance optimization of critical components in maritime vessels
2005 R., Macchiaroli; P., Mancuso; Nenni, MARIA ELENA
UN ALGORITMO EURISTICO DI LOT SIZING AND SCHEDULING IN UN FLOW-SHOP CON VINCOLI DI CAPACITÀ: IL CASO DI STUDIO DI UN IMPIANTO DEL SETTORE ALIMENTARE
2002 Boccia, M.; Sforza, Antonio; Nenni, M. E.
Titolo | Tipologia | Data di pubblicazione | Autore(i) | File |
---|---|---|---|---|
Master production schedule generation in a multi-item single-machine capacited manufacturing system with sequence-dependent setup times and costs | 4.1 Articoli in Atti di convegno | 2005 | F., Frattini; Nenni, MARIA ELENA; Rossi, Angelo; M., Schiraldi | |
Determining safety stock with backlogging and delivery spare time | 4.1 Articoli in Atti di convegno | 2005 | Nenni, MARIA ELENA; M., Schiraldi; S., VAN DE VELDE | |
Development of an intelligent tool fro the remote maintenance optimization of critical components in maritime vessels | 4.1 Articoli in Atti di convegno | 2005 | R., Macchiaroli; P., Mancuso; Nenni, MARIA ELENA | |
UN ALGORITMO EURISTICO DI LOT SIZING AND SCHEDULING IN UN FLOW-SHOP CON VINCOLI DI CAPACITÀ: IL CASO DI STUDIO DI UN IMPIANTO DEL SETTORE ALIMENTARE | 2.1 Contributo in volume (Capitolo o Saggio) | 2002 | Boccia, M.; Sforza, Antonio; Nenni, M. E. |
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile